DoD July 2026 Contract Awards Just Posted: $25.25B, Up From $2.65B on Oct 3
Pulled Oct 20, 2026. DoD July is $25.25B, up from $2.65B on Oct 3. Last July was $43.20B. August is still $22.1M against $42.83B. The largest new contract in the file is TOTE Services at $2.21B.
Short answer: DoD July 2026 contract obligations are $25.25B, up from $2.65B on Oct 3. Last July was $43.20B. August is still $22.1M against last August's $42.83B.
Live federal contract data. No account needed for a quick look.
DoD July 2026 is $25.25B. On Oct 3, the same month read $2.65B.
$22.60B landed in the file in 17 days. Last July was $43.20B, so about 58% of last year's month is in. About $17.95B of July is still out. August has not started: $22.1M against $42.83B last August.
If you sell to the Pentagon, this is the week the July rows become a capture fact. December is when September arrives. July is here.
Open the $2.21B TOTE contract · July shipbuilding, NAICS 336611 · The Oct 3 read, when July was $2.65B
What moved since Oct 3
DoD contract obligations, award types A through D. Source: USASpending spending_over_time, pulled Oct 20, 2026. The Oct 3 column is what the Q4 post reported that day.
| Month | FY2026 now | FY2026 on Oct 3 | FY2025 |
|---|---|---|---|
| July | $25.25B | $2.65B | $43.20B |
| August | $22.1M | $22M | $42.83B |
| September | $158.4M | $74M | $92.36B |
June, which is no longer the story, moved from $43.19B on Oct 3 to $44.30B. The quarter versus last year is now short $152.95B, not the $175.6B we measured on Oct 3. July is the reason. August and September are still empty.
On a 90-day lag, July should be arriving now. August 31 plus 90 days is late November. September still lands in December. The alert you set for "the year-end file" is an August alert and a September alert, not one email in January.
Who the $25.25B went to
| Service | July 2026 |
|---|---|
| Department of the Navy | $10.54B |
| Department of the Army | $4.58B |
| Department of the Air Force | $3.53B |
| Defense Logistics Agency | $3.39B |
| Missile Defense Agency | $1.65B |
Navy is the file. The largest recipient row is Lockheed Martin at $2.41B, and a second Lockheed Martin row is $1.79B. Those are separate recipient records in USASpending. Raytheon is $2.10B. TOTE Services is $2.21B on a single contract.
The checks inside July
The largest obligation in the month is a new contract. Several of the rows under it are not.
| Date | Obligation | Recipient | What it is | PIID |
|---|---|---|---|---|
| Jul 13 | $2.21B | TOTE Services | Base definitive contract. Navy shipbuilding. | N0002426C2421 |
| Jul 15 | $1.81B | Raytheon | Modification P00040. SPY-6 hardware and sustainment. | N0002422C5500 |
| Jul 15 | $1.60B | Lockheed Martin | Base delivery order. F-35 initial spares. Not an open bid. | N0001926F2171 |
| Jul 20 | $1.35B | Lockheed Martin | Modification P00128. THAAD production. | HQ014717C0032 |
| Jul 16 | $701.9M | Electric Boat | Modification P00012. Virginia-class Block VI. | N0002424C2110 |
| Jul 15 | $439.4M | Lockheed Martin | Base definitive contract. ATACMS Lot 7. | W31P4Q26C0019 |
| Jul 15 | $415.5M | Northstar Maritime Dismantlement | Base definitive contract. Dismantle and dispose. | N0002426C4137 |
| Jul 15 | $288.4M | Walsh Federal | Base definitive contract. F-35 sustainment center. | N4008526C0016 |
Five of these eight are definitive contracts with mod 0: TOTE, ATACMS, Northstar, Walsh, and the pattern continues just under the table with Raytheon at $270.1M for the Mk 99 fire-control system, PIID N0002426C5340. The $1.60B F-35 row is a delivery order. The SPY-6, THAAD, and Virginia-class rows are modifications on contracts those companies already hold.
A delivery order or a P00xxx modification is an incumbent getting paid. A mod 0 definitive contract is a new award record. Open the PIID before you put the dollar figure in a pipeline review.
Where a bidder shows up
| NAICS | July DoD | What it is |
|---|---|---|
| 334511 | $2.81B | Search and navigation. The SPY-6 modification lives here. |
| 336611 | $2.73B | Shipbuilding. TOTE, Electric Boat, Northstar. |
| 336414 | $2.43B | Missiles and space vehicles. THAAD and ATACMS. |
| 336411 | $2.07B | Aircraft. The F-35 spares delivery order. |
| 541330 | $1.83B | Engineering services. |
| 541715 | $1.70B | R&D, physical and engineering. |
| 236220 | $1.10B | Building construction. Walsh's F-35 hangar is in this code. |
If you sell engineering, open 541330. If you sell shipbuilding or ship repair, open 336611. The search is live awards in that code. It is not filtered to July. The PIID is how you confirm a specific July row.
What to do this week
Caveats
Related: The Oct 3 read, when the hole was $175.6B · FY2027 first 12 days, once Defense is removed · FY2027 recompetes by NAICS
Related Guides